When performing longitudinal tests, the test generator will have a dual output.
Refer to Table 4.2 for switch positions for each test condition.
Note: Other outside plant leads associated with the unit should be grounded during the test and the test repeated with these leads
terminated as in service. Leads that do not connect to outside plant should be terminated as appropriate for the operating
mode(s) of the unit.
Figure 4.1
Connection Appearances
Passing Criteria
Passing criteria for the First Level Lightning Surge Test and the First Level AC Power Fault
Test is that the EUT will not be damaged and that it will operate as intended after the stress
is removed. Passing criteria for the Second Level Lightning Surge Test and Second Level
Table 4.1
Test Conditions
Test
Two-wire Interface
Four-wire Interface
A
1. Tip to Generator, Ring to Ground
2. Ring to Generator, Tip to Ground
3. Tip and Ring to Generator simultaneously
1. Each lead (T, R, T
1
, R
1
) to the Generator with the other three
leads grounded
2. Tip and Ring to Generator, simultaneously; T
1
and R
1
to
Ground
3. T
and R
1
to Generator, simultaneously; Tip and Ring to
Ground
B
Tip and Ring to Generator simultaneously
T, R, T
1
, R
1
to Generator simultaneously
Table 4.2
Connections to Test Generator
Condition
S1
S2
S3
S4
Condition A-1 of Table 4.1
Closed
Open
Open
Closed
Condition A-2 of Table 4.1
Open
Closed
Closed
Open
Condition A-3 of Table 4.1
Closed
Open
Closed
Open
T
E
R
M
T
E
R
M
Associated
Outside
Plant
Leads
Switch Unit
Under Test
Tip
S2
Ring
S4
S1
S3
Limiting
Resistance
(If Specified)
Test Generator
Voltage
Source