Specifications are subject to change without notice (25.10.99)
3
Example 1
(Types C .0.)
OFF-time period first
The time period starts when
power supply is applied.
At the end of the first set time
period, the relay operates. At
the end of the second set
time period (equal to the first),
the relay releases.
This sequence is repeated un-
til power supply is interrupted.
If power supply is disconnect-
ed, the time is reset and a re-
covery period of 250 ms sho-
uld be allowed before the re-
cycler is ready for reactiva-
tion.
Example 2
(Types C .1.)
ON-time period first
The relay operates and the
time period starts immediately
when power supply is applied.
At the end of the first set time
period, the relay releases. At
the end of the second set
time period (equal to the first),
the relay operates again.
This sequence is repeated
with equal intervals until pow-
er supply is interrupted. If
power supply is interrupted,
the time is reset and a recove-
ry period of 250 ms should be
allowed before the recycler is
ready for reactivation.
C 108, C 208, C 118, C 218
C 101, C 201, C 111, C 211
Power supply
C 101, C 111
C 201, C 211
Power supply
C 108, C 118
C 208, C 218
Knob-adjustable on scale in
seconds.
Sockets
Hold down spring
Mounting rack
Socket cover
Potentiometer lock
S 408, S 411
HF
SM 13
BB4
PL 1
For further information refer to "Accessories".
Power supply
Example 1: Relay on
Example 2: Relay on
Mode of Operation
Wiring Diagrams
Time Setting
Accessories
Operation Diagram